CZPT truck crane QY25V432 ZTC250V452
Description
1. four sections of the longest 33.4 meters U-formed major arm, 1 section of 8 meters jib, the greatest lifting height of 41.eighty four meters.
2. The complete lifting capability is larger than the industry’s 20-ton solution by far more than 10%, the standard arm greatest lifting torque is 882kN·m, and the complete-extension arm optimum lifting torque is 517.4kN·m, which can change 25 tons of operation below most functioning situations.
three. twenty five-ton truck crane chassis, with 12% ability to acquire: better dependability, basic safety, decrease routine maintenance expenses.
four. the total update of the handling overall performance, operating velocity, easy motion and micro-movement perfect harmony.
5. mature and dependable combination of elements, to achieve large working functionality of far more than 10% with 90% of the working expenses of the same amount of business items.
6. Ergonomic optimization based mostly on operational safety and efficiency enhancement.
Specification
Merchandise | Value | Remarks | ||
Working performance | Max. rated lifting potential kg | 16000 | ||
Max. load instant of standard increase kN.m | 710 | |||
Max. load moment of Max. duration boom kN.m | 408 | |||
Max. lifting top of major boom m | 31.08 | These parameters do not include deflection of growth and jib. | ||
Max. lifting height of jib m | 38.five | |||
Working speeds |
Max. hoist rope speed (Major winch) m/min | a hundred and twenty | At 4th layer | |
Max. hoist rope pace (Auxiliary winch) m/min | 108 | At 3rd layer | ||
Increase derricking up moments | 38 | |||
Boom telescoping out times | fifty five | |||
Slewing pace r/min | 3 |
Photos