Manual Operation 10: 1 Ratio Air-Driven Gas Pressure Booster Hydraulic Test Pump System

Manual Operation 10: 1 Ratio Air-Driven Gas Pressure Booster Hydraulic Test Pump System

Technological Parameter of CZPT
 

Gasoline Booster Method
Undertaking parameter
Examination medium 3.5MPa nitrogen or argon
Driven strain three-8Bar
Maximum output strain 80MPa
Medium temperature Standard temperature
Ambient temperature Regular temperature
Management loop 1 way manage loop
control method Manual procedure

Product Description

We can generate a variety of pneumo-hydraulic pressurization techniques according to customers’ needs. These programs can be used for pressure tensioning, hydraulic drive and control, hydraulic check, and so on. The greatest pressure can be up to 6400bar.
CZPT Pneumo-hydraulic Pressurization Technique has compact structure and is effortless to operate. What the users need to have to do is only to lead the travel air to the liquid port, then modify the force regulating valve of the push circuit to get to the needed working pressure. 

Common fuel pressurization operation

Typical purposes:

one.  Static and burst examination for valves, pipe fittings, etc.
2.  Test for vehicle brake system and nozzles.
three.  Chemical reagent injection into pipelines or response kettles.
four. Putting coolant into jars.
five.  Providing pressure for clamping, forming, drilling, shearing and stamping machines.
six. Supplying buffer and elevate pressure to shield molds when large presses overload.
seven. Static and dynamic test for aviation components.
8. Overall performance examination and calibration for devices.
nine. Higher strain cleaning and drinking water injection of waterjet reducing products.
10. Injecting oil into lubrication technique of mechanical products.
eleven. Offering clamping force for valve examination.
12. Supplying push drive for shaft sleeve and cylinder liner.
thirteen. Controlling ground and underground protection valves.

Our manufacturing facility

FAQ

one. Shipping Expression: FOB HangCZPT, by vessel
two. Supply Time: fifteen-twenty days
three. Payment Terms: T/T (one hundred% to pay out by T/T )
four. Installation / Procedure / Service / Manual: In English
five. Warranty: 1 calendar year from the day of completion of the commissioning.
six. Pre-shipment CZPT: Provider must demo operate complete line at supplier’s manufacturing facility prior to shipment.

About transport

Fumigation wood circumstances, which are effectively sealed and powerful adequate for prolonged-time period trip, and suitable for multi-occasions loading & unloading by forklift.

 

Manual Operation 10: 1 Ratio Air-Driven Gas Pressure Booster Hydraulic Test Pump System