Melt Pump for Reaction Kettle

Melt Pump for Reaction Kettle

Melt Pump for Response Kettle

This variety of GM-LK collection melt pump installed under the response kettle as discharge pump 

GM-LK sequence soften pump is primarily used for transporting medium or substantial viscosity medium out of the vacuum response kettle&period On basis of massive suction inlet flange design&comma the high viscosity medium is able to take up inside of beneath vacuum conditions&interval This series of melt pump is largely relevant for Ab muscles&comma PS&comma PMMA&comma PBT&comma PT&comma and so forth&interval
 
Technological Parameter
Materials for Soften Pump Physique&colonStainless Steel
Materials for Gear&colon M2 Steel &lparOptional&rpar
Material for Sliding Bearing&colon Substantial Temperature Instrument Steel or Stainless Steel
Shaft Sealing&colon Packing Sealing
Heating System&colon Heating Medium or Conduction Oil &lparZB-K sequence soften pump adopts electrical heating&period of time&rpar
Model&solFlow Assortment&colon &period5CC – 2500CC&comma &period5cm3&solrev – 2500cm3&solrev

Technical info&colon
1&period of time Rotate velocity&colon ≤ 60rpm&lparAdjustable&rpar
2&period Temperature&colon 400° C &lparmax&period of time &rpar
3&interval Max&interval Outlet strain&colon 350Bar
four&time period Max&interval Differential force&colon 275Bar
five&interval Heating approach&colon Stainless Metal Cartridge Heater
six&period Fastening elements&colon twelve&period9 high-power screws
seven&interval Voltage&colon 380V&lparOthers are optional&rpar
eight&interval Frequency&colon 50Hz&lparOthers are optional&rpar

Benefits of Making use of CZPT GM-LK collection Melt equipment Pump&colon
one&interval Decreasing tension on the extruder by means of shifting the job of developing stress to the melt pump&semi

2&period Escalating the hourly output&semi

3&time period Getting rid of the output variants and strain pulsations&comma therefore significantly bettering the solution quality&semi

4&time period Saving raw substance by signifies of tighter manufacturing tolerances&semi

five&period Bettering the the dimensional precision in the course of the manufacturing of sheets and profiles&semi

6&interval Optimizing the surface and optical top quality throughout the creation of films&comma sheets and profiles&semi

seven&interval Improving the item good quality with regard to homogeneity and pellet measurement in compounding&semi

eight&interval Extending the life time of the upstream equipment&semi

Product show 

Installation of this type of pump 

Technical info
 

Sort
 
Volume
&lparcc&solr&rpar
Max roate velocity
&lparr&solmin&rpar
Outlet force
&lparMPa&rpar
Inlet force
&lparMPa&rpar
Price of flow       m3&solh Temperature
 
Low viscosity content
one-1000Pa·s
Substantial viscosity material
one thousand~8000Pa·s
 
Ultra-high viscosity materials
>&equals8000Pa·s
GM-LK-a hundred 100 100 ≤35 Vacuum~5&period0 ≤0&period51 ≤0&period36 ≤0&period21 ≤350ºC
GM-LK-one hundred sixty one hundred sixty 100 ≤0&period82 ≤0&period57 ≤0&period34
GM-LK-200 two hundred 100 ≤1&period0 ≤0&period7 ≤0&period4
GM-LK-250 250 one hundred ≤1&period3 ≤0&period9 ≤0&period5
GM-LK-355 315 100 ≤1&period6 ≤1&period1 ≤0&period7
GM-LK-five hundred five hundred 100 ≤2&period6 ≤1&period8 ≤1&period1
GM-LK-750 750 eighty ≤3&period1 ≤2&period1 ≤1&period3
GM-LK-1250 1000 eighty ≤4&period1 ≤2&period9 ≤1&period7
GM-LK-2000 2500 eighty ≤10 ≤7 ≤4
GM-LK-3150 3150 80 ≤13 ≤9 ≤5
GM-LK-4500 4500 60 ≤14 ≤10 ≤6
GM-LK-6300 6300 sixty ≤19 ≤13 ≤8
GM-LK-8000 8000 sixty ≤24 ≤17 ≤10
GM-LK-12000 12000 50 ≤31 ≤21 ≤13
GM-LK-25000 25000 fifty ≤64 ≤45 ≤27
Remark&colonthe melt gear pump stream is associated with the operate pace&comma content viscosity&comma stress&comma
So the design variety remember to ask for us&time period
 

 
Quality inspection
 We take only firstclass steel and check every production procedure to ensure every dimension is produced precisely&period A final complete inspection will be executed  before delivery&period  
 
Commissioning
We provide the operation manual for customers to gudie to install the screen changer&comma and at the requirement of user&comma salers should send technician to install and commissioning the die at site of Buyers&comma expenses of the trip should be borne by Buyers&interval
 
Right after-sales service
12 months with proper operation by user&comma all the spare parts shall be replaced free of charge under guarantee period&comma fee for transportation and packing will be borne by users&time period
 
 
About CZPT
 
HangCZPT CZPT Machinery Co&interval&commaLtd&comma a high-tech company with deep technology background and strong work team and services in CZPT&period Our global team is dedicated to equipping our customers with the competitive solutions&period Our business across the hydraulic screen changer&sol melt filter&comma melt gear pump&comma extrusion dies&commaand plastie recycling granulator&interval
CZPT is a  rapidly growing company&comma it has a large number of sensior technicians and and full of passion and ambitious young people&period  the deep technical background and  sense of responsibility  work team determine it is standing on  a high starting point&period  
We do not just supply  the products &comma but also provide value-added  solutions to more customers in more markets all around the world &period In the process&comma we’re helping manufacturers everywhere improve productivity&comma cut costs&comma increase energy efficiency&comma eliminate scrap&comma reduce cycle times and do whatever else it takes to succeed in today’s complex global economy&time period
Our team is  committed to provide customers the best products with ever improving design&period Strict production and quality control&commaand the perfect pre-sales and post-sales services&interval
We are on the way to be your most reliable and CZPT partner&comma now more than ever&interval
 
Suggestions for customers
How to choose a most appropriate kind of display screen changer for your extrusion line &quest
After the equipment supplier creating a dimensions suggestion and then you need to carry out your personal examination to validate proper sizing&period of time That way&comma you will have the benefit of impartial analyses and&comma greatest of all&comma there is no extra expense&interval
Understand the difference in between price tag and price&period of time Be confident to just take into consideration all of the variables and search at all the factors to determine the real expense of ownership for the monitor changer&interval Some of the concealed variables to consider may be&colon
&bulletProduct quality&interval
&bulletMaintenance&comma time and value of parts&interval
&bulletProcess downtime and price&interval
&bulletLife expectancy for the gear and amortized cost of ownership&time period
&bulletCost and availability of filtration media&interval
&bulletPressure decline and result on line output and product top quality&period
&bulletOperator security&period
&bulletRequired operator intervention and labor expense&period
If all of these and other elements are taken into thought&comma you can select the most appropriate resolution&comma and then you can anticipate a significantly much better return on expenditure&period of time
 

Melt Pump for Reaction Kettle